Measure C (2002)
- Repaired and/or replaced HVAC
- Replaced interior finishes including floors, wall surfaces and ceilings
- Installed new whiteboards, casework and cabinets
- Upgraded the rest rooms including access compliance, toilets, sinks and partitions
- Provided access compliance upgrades
- Replaced all exterior doors and hardware
- Repaired and/or replaced roofs as needed
- Upgraded the electrical system and increased power capacity in classrooms to accommodate technology
- Installed new telephones, clocks, bells, fire alarm and intrusion alarm
- Installed new energy efficient lighting fixtures and controls
- Repaired dry rot and termite damage as needed
- Abated asbestos as needed
- Replaced old furniture
- Painted the exterior campus and repaired tile as needed
- Replaced multipurpose room floor
- Provided a computer/training lab
- Installed new underground infrastructure and structured cabling
- Upgraded active distribution equipment and network server
- Deployed 56 new computers
- Mounted LCD projectors
Carl Sundahl Elementary School
- Replaced exterior siding
- Installed a new computer lab
- Deployed 47 new computers
Empire Oaks Elementary School
- Deployed 12 new computers
Folsom Hills Elementary School
- Installed infrastructure for cable television
- Replaced network server
- Replaced structured cabling plant and active distribution equipment
Gold Ridge Elementary School
- Placed two relocatable classrooms to house additional enrollment
- Upgraded network server
- Replaced active distribution equipment
- Deployed 46 new computers
Natoma Station Elementary School
- Replaced multipurpose flooring
- Replaced network server
- Replaced active distribution equipment
- Deployed 46 new computers
Oak Chan Elementary School
- Replaced exterior siding
- Installed underground data infrastructure
- Replaced structured cabling plant
- Replaced network server
- Replaced active distribution equipment
- Deployed 72 new computers
Russell Ranch Elementary School (Measure C and State School Building Program funds)
- Constructed a new elementary school which included:
- 25 classrooms
- Learning resource center
- Multipurpose room
- Administration
Sandra J. Gallardo Elementary School (Measure C and State School Building Program funds)
- Constructed a new elementary school which included:
- 25 classrooms
- Learning resource center
- Multipurpose room
- Administration
- Repaired or replaced HVAC
- Replaced interior finishes including floors, wall surfaces and ceilings
- Installed white boards, casework and cabinets
- Upgraded rest rooms including accessibility, toilets, sinks and partitions
- Provided access compliance upgrades
- Replaced all exterior doors and hardware
- Repaired and/or replaced roofs as needed
- Upgraded electrical system and increased power capacity in classrooms to accommodate technology
- Installed new signal systems, including telephone, intercom, clocks, bells, fire alarm and intrusion alarm
- Installed new energy efficient lighting fixtures and controls
- Repaired dry rot and termite damage as needed
- Abatement of asbestos as needed
- Replaced old furniture
- Provided underground infrastructure and structured cabling
- Upgraded server and active distribution
- Deployed 54 new computers
- Installed new laser printers
Folsom Middle School (Measure C and State School Building Program funds)
- Renovation project included:
- Repaired/replaced HVAC
- Replaced interior finishes including floors, wall surfaces and ceilings
- Installed new white boards, casework and cabinets
- Upgraded rest rooms including access compliant toilets, sinks and partitions
- Provided access compliance upgrades
- Repaired and/or replaced roofs as needed
- Upgraded electrical system and increased power capacity in classrooms to accommodate technology
- Installed new energy efficient lighting fixtures and controls
- Repaired dry rot and termite damage as needed
- Abated asbestos as needed
- Relocated and/or refurbished existing portable buildings
- Replaced of old furniture
- Installed infrastructure for cable television
- Upgraded active distribution hardware
- Replaced administrative server
- Deployed new computers
- Mounted LCD projectors
- Connected portables to the local area network
- New gymnasium project included:
-
- 14,000 square foot gymnasium with wood floor system
- 2,600 square foot exercise room
- 5,000 square foot of locker rooms
- Staff and storage areas
- Site work project included:
-
- Constructed a new pedestrian and bicycle path from the east side of the campus to the bike storage area for safety
- Graded the eastern portion of the site, irrigated and landscaped to create a new 400-meter running track with a turf infield useable for field sports
- Relocated portable buildings to a planned grouping near the rear of the campus
- Converted of a relocatable to a restroom near the play fields
- Added parking near the multipurpose building
- Extended the student drop off lane
- Landscaped the center of the campus to provide walkways between the buildings
- Extended the automatic irrigation system to portions of the campus currently without irrigation
- Added of lighting at the interior of the campus
Sutter Middle School (Measure C and State School Building Program funds)
- Converted Wing G to a cafeteria annex and art room
- Refurbished kitchen and multipurpose room
- Removed stage and replaced flooring
- Added structured cabling
- Upgraded active distribution equipment
- Replaced server
- Deployed 70 new computers
Folsom High School (Measure C and State School Building Program funds)
- Constructed a new performing arts theater:
- 18,600 square foot performing arts theater
- 700 seats
- Full stage and support facilities
- Constructed a new athletic stadium which includes:
- Football/soccer fields
- Lighting
- All-weather track
- Grandstands seating 5,000
- Concessions
- Toilet building
- Constructed a new field house
- Upgraded fire alarm system
- Installed four relocatable classrooms for added enrollment
- Upgraded the administrative and curriculum network servers
- Deployed 98 new computers
Vista del Lago High School (Measure C and State School Building Program funds)
- Constructed a new high school
- 1,500 pupil capacity
- Main and auxiliary gymnasiums
- 13,300 square foot joint-use library with the City of Folsom
- Swimming Pool
- Practice football field with artificial turf and an all-weather track
Folsom Lake High School
- Installed cable television infrastructure
- Upgraded network server
- Deployed 12 new computers