• Mitchell Middle School
     
     
    Measure N and P Improvements
     
    Improvements funded from Measure N that were completed during 2007/2008:
    • Converted metal shop to a standard classroom
    • Reconfigured home economics to provide six teaching stations
    • Painted campus interiors as needed
    • Replaced floors, ceilings, lighting and casework in classrooms as needed
    • Renovated the kitchen area
    • Replaced door hardware
    • Installed new blinds or window coverings in all classrooms
    • Replaced drinking fountains with access compliant units
    • Provided access compliance upgrades
    • Installed a new clock system
    • Replaced fire and intrusion system with an addressable system
    • Replaced furniture and equipment as needed
    • Installed a digital marquee
    • Replacement of some student and staff computers
    • Updated network hardware
    • Installation of Interactive White Boards (SmartBoards) in all classrooms
    Improvements funded from Measure N that were completed in 2008:
    • Renovation of gymnasium, including:
      • Installed new curtains
      • Provided new wood flooring and bleachers
      • Installed cowl wall to provide better lighting
      • Abated ceilings
      • Converted shower areas to locker space and storage
      • Installed new lockers
      • Replaced roofing
      • Installed access compliant drinking fountains
      • Refinished terrazzo flooring
      • Upgraded clock/speaker, sound system and lights
      • Painted the exterior

    Improvements funded from Measure N that were completed in 2009: 

    • Upgraded the music building
    • Installed a shade structure
    • Reconfigured and expanded parking lot
    • Resurfaced asphalt
    • Provided new parking lot lighting
    • Installed exterior security lighting
    • Installed new decorative iron fencing
    • Repaired walkway drainage in central quad, music and library buildings
    • Upgraded irrigation booster pump to serve entire campus
    • Installed parcourse
    • Installed new landscaping
    Additional improvements that may by funded through Measure N and P:
    • Continued upgrade of campus computers
    • Upgrade  the landscape common areas as needed
    • Installation of video surveillance