White Rock Elementary School
Modernization 2009

 

Project Description:  Renovate playfields; provide digital marquee sign and site map signs; replace chain-link fence along street with six foot high decorative iron fence; provide trash enclosure; at courtyards, provide concrete bases for tables and pathways; replace old walkways; enhance entry walkways to administration building; repair irrigation pipes in front of Unit A and D; provide a shade structure; extend the parking lot to allow for 70 staff; new bus drop-off area to allow for (2) full-size buses and (1) mini-bus; old bus drop-off to be converted to parent drop-off; relocate the hard courts into the playfield; provide new basketball backstops and tetherball poles; provide sealcoat and striping; provide fly fan for Kitchen; improve ventilation in Kitchen; move Library to Room 3 and convert old library to a conference room and RSP offices; repair HVAC; provide video surveillance; provide exterior lighting at 1) between Computer Lab, Kindergarten, and portables, 2) entry; and improve security for bike rack area and provide new bike rack.

Project Funding:  The project construction cost is $2.6 million and is funded from Measure N.

Project Timeline:  The project began in May 2009 and will be complete by August 2009.

Project Progress Photos:
     April 16, 2009
    
June 2, 2009
     June 4, 2009
     June 16, 2009
     July 8, 2009
     July 9, 2009
     July 22, 2009
     September 29, 2009

 