Project Description:
Removal and replacement of
covered walkway roofing; removal of existing HVAC systems in existing
classrooms; roof framing demolition and reconstruction required by the
HVAC system upgrades; removal and replacement of the existing suspended
acoustical tile ceilings as necessary to accommodate installation of the
new HVAC systems and roof framing revisions; replacement of the master
clock and intrusion alarm system; remodel of administration; conversion
of two classrooms into new computer lab and library; replacement of door
hardware throughout campus; and alterations to site and landscaping.
Project Funding:
The estimate construction cost include architect and engineering fees is
$2.0 million. This project is being funded from Measure B and Measure N.
Project Timeline: The project began in June 2007 and is scheduled for completion by the
start of school.
School Front Landscape Plan:
RCE Landscape (large PDF file)
School Site Before Pictures:
August 2006
April 2007
Project Progress Pictures:
May 16, 2007
June 20, 2007
July 2, 2007
July 26, 2007
August 2, 2007
August 8, 2007
September 18, 2007
October 25, 2007