FCUSD web logo
sitemap   

Department of Facilities Planning and Development

Rancho Cordova Elementary School
Modernization 2007

Project Description:  Removal and replacement of covered walkway roofing; removal of existing HVAC systems in existing classrooms; roof framing demolition and reconstruction required by the HVAC system upgrades; removal and replacement of  the existing suspended acoustical tile ceilings as necessary to accommodate installation of the new HVAC systems and roof framing revisions; replacement of the master clock and intrusion alarm system; remodel of administration; conversion of two classrooms into new computer lab and library; replacement of door hardware throughout campus; and alterations to site and landscaping.

Project Funding:  The estimate construction cost include architect and engineering fees is $2.0 million.  This project is being funded from Measure B and Measure N.

Project Timeline: The project began in June 2007 and is scheduled for completion by the start of school.

School Front Landscape Plan:  RCE Landscape (large PDF file)

School Site Before Pictures:
     August 2006
     April 2007

Project Progress Pictures:
     May 16, 2007
     June 20, 2007
     July 2, 2007
     July 26, 2007
     August 2, 2007
     August 8, 2007
     September 18, 2007
     October 25, 2007

NOTE:  Be sure you are viewing the most recent version of this page, press "F5" to refresh

 

top of page

PDF files require a PDF viewer. Get Adobe Acrobat Reader