Project Description: Includes
abatement of blown-on acoustical asbestos ceiling;
installation of new lighting; replacement of the
gymnasium flooring; installation of new bleachers;
interior painting; new doors and hardware; acoustical
treatments and refinishing of the wrestling room floor.
Project Funding:
The project construction cost was
$1.2 million and was funded from Measure B.
Project Timeline:
The project began in June 2004 and was complete by
November 2005.
Project Progress Pictures:
INITIAL
SCOPE: Renovate staff toilet rooms and faculty rooms; replace HVAC system
unit ventilator fans and HVAC system upgrades where needed; replace
cafeteria stage folding partition; replace flooring in cafeteria, and
wings A, B, C and D; demolish and replace AJ Academy and computer lab
relocatable buildings; repair or replace cabinets as needed, wall
finishing, doors and ceilings as needed; install energy management
controls campus-wide; replace windows as needed; replace asphalt walkways
with concrete; reconfigure administration building; paint exterior
buildings of the campus; and remodel a portion of D wing for a new
attendance and counseling center. ENHANCEMENTS:
Reduced cost of asbestos abatement removal allowing
replacement of VAT flooring with new flooring; painted interior of
cafeteria and administration; installation of new phone service trunk
(funded through E-Rate); installed spare conduit throughout site for
future low voltage needs (funded by maintenance); replaced vinyl flooring
in four science rooms; and added carpet and wall finishes to the
administration building.
Project Progress
Pictures:
June 21, 2004
June 25, 2004
June 23, 2004
June 28, 2004
July 15, 2004
August 10, 2004
August 25, 2004
September 30, 2004
November 12, 2004
January 31, 2005
February 7, 2005
February 15,
2005
April 21, 2005
June 16, 2005
June 23, 2005
July 11, 2005
August
3, 2005
November 21, 2005