Cordova High School
Wing G HVAC, Stadium Renovations and Site Work
 

Project Description:  Includes repair or replacement of the resilient all-weather track; replacement of the football field with a new synthetic turf field; replacement of the bleachers on both sides of the stadium; renovation of the restroom exterior and roofing; new heating and air-conditioning system for Wing G; repaving of the bus loading area, student parking, and hard court area; and, possible improvements such as a snack bar that may be incorporated into the stadium area, contingent on volunteer funding.

Project Funding:  The project construction cost was $4.4 million and was funded from Measure B.

Project Timeline:  The project began in April 2003 and was complete by August 2003.

Project Pictures Prior to Start of Work:
     Before Project

Project Progress Pictures:
     May 13, 2003 
    
May 16, 2003 
 
  
June 3, 2003
     June 24, 2003   
    
July 8, 2003
     July 15, 2003 
 
   
July 20, 2004
     July 21, 2003 
     July 22, 2003
     July 24, 2003 
     July 25, 2003
     July 29, 2003
     August 5, 2003
     August 14, 2003
     August 18, 2003
     September 9, 2003 
    
March 3, 2004 
    
June 23, 2004 

 

top of page

PDF files require a PDF viewer. Get Adobe Acrobat Reader