Project Description: 
Removal and replacement of covered walkway roofing; removal of existing HVAC systems in classrooms; roof framing demolition and reconstruction required by the HVAC system upgrades; removal and replacement of the existing suspended acoustical tile ceilings as necessary to accommodate installation of the new HVAC systems and roof framing revisions; replacement of the master clock and intrusion alarm system; minor ADA upgrades to drinking fountains; remodel of administration; conversion of two classrooms into new computer lab and library; replacement of door hardware throughout campus; and alterations to site and landscaping.

Project Funding:  The estimate construction cost include architect and engineering fees is $1.9 million.  This project is being funded from Measure B and Measure N.

Project Timeline: The project began in June 2007 and is scheduled for completion by the start of school.

School Front Landscape Plan:  CG Landscape (large PDF file)

School Site Before Pictures:
   
 Before Pictures - August 22, 2006
     Before Pictures - May 15, 2007


Project Progress Pictures:
  
  June 20, 2007

     July 2, 2007
     July 26, 2007
     August 2, 2007
     September 10, 2007
     October 25, 2007